Two quotes for the same ten skulls can differ by 40 per cent and both be honest. The difference is almost always what is included, not what the pieces cost.
This is how to read a carving quote so you are comparing the same thing.
The four terms you will see
Quotes are usually written against one of these. The terms are standardised, which is exactly why you should insist on one of them rather than "delivered price".
| Term | Supplier delivers to | You arrange and pay for | Your risk starts |
|---|---|---|---|
| EXW (Ex Works) | Their workshop | Everything: inland freight, export clearance, main carriage, import, duty | At their door |
| FOB (Free On Board) | Named port, cleared for export | Main carriage, insurance, import clearance, duty, inland delivery | When it is on the vessel |
| CIF (Cost, Insurance, Freight) | Your destination port | Import clearance, duty, inland delivery to your premises | When it is on board the vessel — the same point as FOB, not at your port |
| DDP (Delivered Duty Paid) | Your premises | Nothing — duty and clearance are included | On delivery |
FOB is the most common for wholesale carving orders and usually the easiest to compare, because the supplier's responsibility ends at a clearly defined point.
DDP looks simplest and is often the most expensive, because the supplier is carrying customs risk and will price that uncertainty in. It is worth having for a first order if you want no surprises; it is rarely the cheapest way to import at volume.
CIF is the one that misleads people, because the insurance in the name is the seller's policy for the main carriage and not cover for your goods at your premises. Cargo insurance for stone carvings sets out who can actually claim under each term, and why the carrier's own liability will not cover a carving.
What a complete quote should list
Ask for each of these explicitly. A quote that omits several is not necessarily dishonest, but you cannot compare it.
- Per-piece and total price, in a named currency
- Quantity per design and material
- Finished weight and L × W × H of the actual pieces, not a typical figure
- Carton count, carton dimensions and packed weight per carton
- Chargeable weight, and the volumetric divisor the freight quote uses (commonly 5000, sometimes 4000 or 6000)
- Incoterm and named port or place
- Lead time, split into production time and transit time
- Payment terms and what triggers each stage
- Validity period of the quote
> Carton dimensions matter more than buyers expect. Carved stone is bulky once protected, so shipments frequently bill on volumetric weight rather than actual weight — and that is decided by the carton, not the carving.
Several of these items come from the supplier's spec sheet rather than the quote itself, and a sheet that leaves them blank is the reason a quote cannot be compared. Reading a carving spec sheet covers which fields have to be there and what their absence tells you.
The line items that change the total
These are legitimate but easy to miss:
- Export packing. Individual boxes, foam and an export carton are real costs. Ask whether they are in the unit price.
- Inland haulage from the workshop to the port, if the quote is FOB.
- Duty and import VAT/GST. Your responsibility on FOB terms, and not trivial.
- Customs brokerage at your end.
- Insurance. Often around a small percentage of the CIF value, and worth having on stone.
- Currency conversion and any transfer fees on payment.
Comparing two quotes properly
- Convert both to the same Incoterm. A CIF quote will always look worse than an EXW quote for the same goods.
- Convert both to a landed cost per piece — goods plus freight plus duty plus fees, divided by the number of pieces.
- Check the specification is identical. Same material, same size, same finish. A cheaper quote for a "similar" piece is not a cheaper quote.
- Check the weight. Price per kilogram is a better comparison than price per piece, because it normalises for size.
- Check what happens if a piece arrives damaged. Who pays, and what evidence do they need.
Only then compare the numbers.
Red flags worth taking seriously
- A price far below every other quote. Either the material or the treatment is not what was described, or something is excluded. Ask which.
- No specification at all — just "10 crystal skulls". You cannot verify the delivery against it.
- Reluctance to name an Incoterm. Suggests the quote is a guess.
- Refusal to state carton dimensions. You cannot budget freight without them.
- Payment entirely by irreversible transfer before production, with no verifiable business behind it.
What a quotation from us contains
We quote per order because size, material and quantity all move the number. Every quote states the pieces, the material and treatment, finished weight and dimensions, carton data, the Incoterm we are quoting on, lead time and payment terms — so you can put it beside another supplier's quote and compare like for like.
If a specification is still open, we will say so rather than quote a number we cannot hold.
Send us your reference, quantity and destination and we will quote it on a stated Incoterm, with the carton data you need to check the freight yourself.